Testing and Validation. |
| Home
| Contact
| About
| Careers | |
How does we test?Activities required to prepare for and conduct the system test include:
This test plan covers a full systems test of the GEMBox. This includes operator and user procedures, as well as program and job control. In addition to comprehensively testing functionality, external interfaces, security, recovery and performance will also be evaluated. ApproachThe test personnel will use the system documentation to prepare all test design, case, and procedure specifications. This approach will verify the accuracy and comprehensiveness of the information in the documentation in those areas covered by the tests. Item pass/fail criteriaThe system must satisfy the standard requirements for system pass/fail stated in the FABMation Development Standards and Procedures. Suspension criteria and resumption requirementsWhen a new version of the system is transmitted to the test group after a suspension of testing has occurred, a regression test will be run. Test deliverables
Test Plan, |
| Copyright © 2008 FABMation GmbH. All rights reserved. Click here to view legal information. |